The tests we apply in accordance with ISO 17025 Standard and DIN 22112-3 Norms:
Roller Abrasion Force Test
Rotary Cavity Tolerance Test
Roller Linear Movement Test
Roller Dust Test
Roller Water Test
Roller Durability Test
Effort and Balance Test
Material Controls
Measurement Controls
Quality Control Process
Customer requests are meticulously analyzed by our technical department. After the project is designed in technical drawing programs and customer approval is obtained, the required materials are carefully procured. Initial measurements of the materials are made at the beginning of the process and continuous quality controls are carried out during the production phase. Supervisors meticulously supervise every step of production.
During the procurement of raw materials, our quality control department rigorously reviews product conformity. At the slaughterhouse stage, the quality control supervisor inspects the materials with measuring devices and corrects them if necessary. In the machining center, pipes and shafts are carefully checked with measuring instruments such as calipers and micrometers after cutting. At the welding station, rolls are welded with covers by automation. At the painting station, the products are carefully painted in a special oven at high temperatures. At the collection center, the products are processed in special presses and prepared for shipment.
Before shipment, our products are meticulously examined in our test and calibration laboratory in accordance with DIN 22112-3 and TS EN ISO/IEC 17025 standards. Packaged in accordance with the highest standards, our products are safely shipped using wooden crates or metal crates.